• NASA Portal
  • Site Help
  • Feedback
  • Phone Book
Search For:
in
  • HOME
  • OVERVIEW
  • DATA
  • ANNEX
  • DOCUMENTS
  • SOFTWARE
  • PERSONNEL
  • RELATED SITES
  • ABOUT PDS
 
  • Instrument
  • Missions
  • Target/Planet
  • Volume Series
  • Errata

QUICK SEARCH

Search By Missions

QUICK LINKS

FAQ
Citation Policy
Errata for all volumes
Help for Data Users
Help for Data Reviewers
Help for Data Providers

PDS NODES

PDS Home
Atmospheres
Geosciences
Cartography and Imaging Sciences
NAIF - SPICE
Ring-Moon Systems
Small Bodies
Galileo >> PWS
Galileo Orbiter Jupiter: GO-J-PWS-2-REDR-LPW-SA-FULL-V1.0 View Errata Order Volume Toggle viewing into brief mode
GO-J-PWS-2-REDR-LPW-SA-FULL-V1.0 PDS 3      CERTIFIED
Start Time: 1995-12-09 07:21:01 - Stop Time: 2002-11-05 22:35:06
This volume contains Galileo Orbiter at Jupiter data from the GO-J-PWS-2-REDR-LPW-SA-FULL-V1.0 data set from 1995-12-07T15:21 to 2003-09-21T18:45.
This volume contains Galileo Orbiter at Jupiter data from the GO-J-PWS-2-REDR-LPW-SA-FULL-V1.0 data set from 1995-12-07T15:21 to 2003-09-21T18:45.     less ...
Citiation Information
TitleGalileo Orbiter Jupiter: GO-J-PWS-2-REDR-LPW-SA-FULL-V1.0
PublisherNASA Planetary Data System
doi https://doi.org/10.17189/1519681
Top/ DATA/ SATELLITES/ IO/ ASCII / click here to download folders and files
ORB00_HIGHRES_1995_12_07_B
Start Time: 1995-12-07T15:21:07.109 Stop Time: 1995-12-08T00:00:03.090
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 1995-12-07T15:21 and
1995-12-08T00:00 (orbit 0).
ORB00_HIGHRES_1995_12_07_E
Start Time: 1995-12-07T15:21:01.109 Stop Time: 1995-12-07T23:59:44.423
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 1995-12-07T15:21 and
1995-12-07T23:59 (orbit 0).
ORB24_HIGHRES_1999_10_11_B
Start Time: 1999-10-11T04:18:20.671 Stop Time: 1999-10-11T06:41:27.333
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 1999-10-11T04:18 and
1999-10-11T06:41 (orbit 24 Io flyby).
ORB24_HIGHRES_1999_10_11_E
Start Time: 1999-10-11T03:42:20.006 Stop Time: 1999-10-11T06:41:46.000
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 1999-10-11T03:42 and
1999-10-11T06:41 (orbit 24 Io flyby).
ORB27_HIGHRES_2000_02_22_B
Start Time: 2000-02-22T11:10:35.240 Stop Time: 2000-02-22T14:25:20.567
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 2000-02-22T11:10 and
2000-02-22T14:25 (orbit 27).
ORB27_HIGHRES_2000_02_22_E
Start Time: 2000-02-22T11:10:53.907 Stop Time: 2000-02-22T14:25:39.234
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 2000-02-22T11:10 and
2000-02-22T14:25 (orbit 27).
ORB31_HIGHRES_2001_08_06_B
Start Time: 2001-08-06T04:25:54.750 Stop Time: 2001-08-06T05:28:45.414
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 2001-08-06T04:25 and
2001-08-06T05:28 (orbit 31 Io flyby).
ORB31_HIGHRES_2001_08_06_E
Start Time: 2001-08-06T04:25:36.083 Stop Time: 2001-08-06T05:29:04.081
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 2001-08-06T04:25 and
2001-08-06T05:29 (orbit 31 Io flyby).
ORB32_HIGHRES_2001_10_16_B
Start Time: 2001-10-16T00:00:36.755 Stop Time: 2001-10-16T01:52:36.751
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 2001-10-16T00:00 and
2001-10-16T01:52 (orbit 32 Io flyby).
ORB32_HIGHRES_2001_10_16_E
Start Time: 2001-10-16T00:00:18.088 Stop Time: 2001-10-16T01:52:55.418
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 2001-10-16T00:00 and
2001-10-16T01:52 (orbit 32 Io flyby).
ORB33_HIGHRES_2002_01_17_B
Start Time: 2002-01-17T13:36:32.355 Stop Time: 2002-01-17T13:40:53.688
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
B-field data acquired at Jupiter between 2002-01-17T13:36 and
2002-01-17T13:40 (orbit 33 Io flyby).
ORB33_HIGHRES_2002_01_17_E
Start Time: 2002-01-17T13:36:13.688 Stop Time: 2002-01-17T13:40:35.022
Galileo PWS calibrated low rate science (LRS) spectrum analyzer
E-field data acquired at Jupiter between 2002-01-17T13:36 and
2002-01-17T13:40 (orbit 33 Io flyby).
ICON LEGEND
For links to data holdings various icons are used to represent services or actions you can take. Those icons are:
Order the volume (CD-ROM/DVD) containing the listed data. The volume will be mailed to you. The volume (CD-ROM/DVD) contains some errors which are documented in an errata log.
Launch a custom web browser for the resource. Launch a map based browser for the resource.
Toggle viewing into brief mode (shorter descriptions are displayed). Toggle viewing into expanded mode (longer descriptions are displayed).
Download the volume containing the listed data.


NEW RELEASES

More.....

PDS RESOURCES

Archive Planning Guide
      Individuals
      Missions
Data Dictionary Search
      Lookup Tool
      Document
PDS4 Standards Documents
PDS Subscription Service

PDS3 Standards

OTHER RESOURCES

ADS Search
Science Data Licenses

Privacy / Copyright
Freedom of Information Act
Web Master: PDS-PPI Operator
NASA Official: Becky McCauley-Rench